| ปี : | 2009 |
| โครงการ : | Nhon Trach II 750 MW CCPP – BOP Lot3 |
| ลูกค้า : | Torishima (Hong Kong) Co.,Ltd. |
| ตำแหน่งที่ตั้ง : | Khon Kaen |
| ขอบเขต : | Design balance of plant. – The system include main cooling water system, fuel gas system, fuel oil system, nitrogen system, compressed air system, service air, water system and waste water system. – ขอบเขต of work include piping work, civil work, coordinate to other process packages. |






